{"id":398784,"date":"2026-08-07T08:00:00","date_gmt":"2026-08-07T06:00:00","guid":{"rendered":"https:\/\/informante.web.na\/?p=398784"},"modified":"2026-08-06T20:14:14","modified_gmt":"2026-08-06T18:14:14","slug":"water-availability-identified-as-key-constraint-for-kharas-green-hydrogen-development","status":"publish","type":"post","link":"https:\/\/informante.web.na\/?p=398784","title":{"rendered":"Water availability identified as key constraint for \/\/Kharas green hydrogen development"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Staff Reporter<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">WATER availability in the \/\/Kharas Region has been highlighted as the primary technical constraint for green hydrogen development, with coastal areas supported by desalination and locations near the Neckartal Dam emerging as the most feasible sites for electrolysis facilities, while inland areas remain more constrained and vulnerable to cumulative pressures.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This was highlighted in the recently released Strategic Environmental and Social Assessment (SESA) for Green Energy Production and Industrialisation in the Southern Corridor Development Initiative (SCDI). The assessment provides a strategic, national-level overview of the environmental risks, constraints and opportunities associated with Namibia\u2019s emerging green hydrogen sector.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cGreen hydrogen production is water-intensive, requiring a reliable supply for electrolysis and cooling, with total raw water demand substantially exceeding the volume required for high-purity electrolysis due to treatment losses,\u201d the report highlights.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The report notes that, while seawater desalination is expected to serve as the primary water source for green hydrogen projects, additional abstraction from regulated systems such as the Neckartal Dam \u2014 subject to further feasibility assessments \u2014 and groundwater use for construction activities, dust suppression and workforce needs could place further pressure on already limited freshwater resources.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cInfrastructure development may also disrupt hydrological processes by altering ephemeral drainage lines, compacting soils, reducing infiltration, and increasing runoff and erosion, particularly in inland areas with low hydrological resilience. Where desalination is employed, marine impacts associated with brine discharge, thermal and chemical changes, and nearshore construction activities require careful management in ecologically sensitive coastal environments,\u201d the report continues.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The report explains that, at the strategic level, water-related impacts are unlikely to be driven by individual projects alone, but rather by the cumulative effects of multiple developments concentrated within technically favourable zones.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cOver time, combined abstraction, infrastructure proliferation and hydrological modification may intensify regional water stress, heighten competition among industrial, agricultural and municipal users, and reduce system resilience to drought and climate variability,\u201d the report adds.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The report notes that impacts on water resources are most significant where developments rely on shared freshwater sources, are located in areas with low aquifer potential, or disrupt key hydrological processes. This reinforces the need for avoidance-led spatial planning, integrated water resource management and strong cumulative impact governance at both strategic planning and project levels.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cClimate change is expected to further increase water sensitivity across the region by intensifying drought frequency, raising evaporation rates, and increasing uncertainty in long-term supply reliability. Rising temperatures increase atmospheric moisture demand, accelerating evaporation and evapotranspiration from soils, surface water bodies, and vegetation, which reduces effective water availability even in the absence of significant declines in rainfall. In arid and semi-arid systems such as the \/\/Kharas Region, this effect is particularly pronounced, as limited rainfall and low groundwater recharge already constrain baseline water availability,\u201d the report warns.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Picture for illustrative purposes only. Photo: Contributed<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Staff Reporter WATER availability in the \/\/Kharas Region has been highlighted as the primary technical constraint for green hydrogen development, with coastal areas supported by desalination and locations near the Neckartal Dam emerging as the most feasible sites for electrolysis facilities, while inland areas remain more constrained and vulnerable to cumulative pressures. This was highlighted &#8230;<\/p>\n","protected":false},"author":10,"featured_media":398785,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[27,24],"tags":[],"class_list":["post-398784","post","type-post","status-publish","format-standard","has-post-thumbnail","category-business","category-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Water availability identified as key constraint for \/\/Kharas green hydrogen development - Informant\u00e9<\/title>\n<meta name=\"description\" content=\"WATER availability in the \/\/Kharas Region has been highlighted as the primary technical constraint for green hydrogen development...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/informante.web.na\/?p=398784\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Water availability identified as key constraint for \/\/Kharas green hydrogen development - Informant\u00e9\" \/>\n<meta property=\"og:description\" content=\"WATER availability in the \/\/Kharas Region has been highlighted as the primary technical constraint for green hydrogen development...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/informante.web.na\/?p=398784\" \/>\n<meta property=\"og:site_name\" content=\"Informant\u00e9\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/informantenam\" \/>\n<meta property=\"article:published_time\" content=\"2026-08-07T06:00:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/informante.web.na\/wp-content\/uploads\/2026\/08\/The-water-challenge-behind-hydrogen-Informante-Image-workspace.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1173\" \/>\n\t<meta property=\"og:image:height\" content=\"775\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Staff Reporter\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@informantenews\" \/>\n<meta name=\"twitter:site\" content=\"@informantenews\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Staff Reporter\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/informante.web.na\\\/?p=398784#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/informante.web.na\\\/?p=398784\"},\"author\":{\"name\":\"Staff Reporter\",\"@id\":\"https:\\\/\\\/informante.web.na\\\/#\\\/schema\\\/person\\\/6ab65e7153fe62b690517153b8913a80\"},\"headline\":\"Water availability identified as key constraint for \\\/\\\/Kharas green hydrogen development\",\"datePublished\":\"2026-08-07T06:00:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/informante.web.na\\\/?p=398784\"},\"wordCount\":473,\"publisher\":{\"@id\":\"https:\\\/\\\/informante.web.na\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/informante.web.na\\\/?p=398784#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/informante.web.na\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/The-water-challenge-behind-hydrogen-Informante-Image-workspace.jpg\",\"articleSection\":[\"Business\",\"News\"],\"inLanguage\":\"en-ZA\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/informante.web.na\\\/?p=398784\",\"url\":\"https:\\\/\\\/informante.web.na\\\/?p=398784\",\"name\":\"Water availability identified as key constraint for \\\/\\\/Kharas green hydrogen development - Informant\u00e9\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/informante.web.na\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/informante.web.na\\\/?p=398784#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/informante.web.na\\\/?p=398784#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/informante.web.na\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/The-water-challenge-behind-hydrogen-Informante-Image-workspace.jpg\",\"datePublished\":\"2026-08-07T06:00:00+00:00\",\"description\":\"WATER availability in the \\\/\\\/Kharas Region has been highlighted as the primary technical constraint for green hydrogen development...\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/informante.web.na\\\/?p=398784#breadcrumb\"},\"inLanguage\":\"en-ZA\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/informante.web.na\\\/?p=398784\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-ZA\",\"@id\":\"https:\\\/\\\/informante.web.na\\\/?p=398784#primaryimage\",\"url\":\"https:\\\/\\\/informante.web.na\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/The-water-challenge-behind-hydrogen-Informante-Image-workspace.jpg\",\"contentUrl\":\"https:\\\/\\\/informante.web.na\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/The-water-challenge-behind-hydrogen-Informante-Image-workspace.jpg\",\"width\":1173,\"height\":775},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/informante.web.na\\\/?p=398784#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/informante.web.na\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Water availability identified as key constraint for \\\/\\\/Kharas green hydrogen development\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/informante.web.na\\\/#website\",\"url\":\"https:\\\/\\\/informante.web.na\\\/\",\"name\":\"Informant\u00e9\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/informante.web.na\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/informante.web.na\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-ZA\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/informante.web.na\\\/#organization\",\"name\":\"Informante\",\"url\":\"https:\\\/\\\/informante.web.na\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-ZA\",\"@id\":\"https:\\\/\\\/informante.web.na\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/informante.web.na\\\/wp-content\\\/uploads\\\/2019\\\/10\\\/Informante-Logo-box-1.png\",\"contentUrl\":\"https:\\\/\\\/informante.web.na\\\/wp-content\\\/uploads\\\/2019\\\/10\\\/Informante-Logo-box-1.png\",\"width\":655,\"height\":656,\"caption\":\"Informante\"},\"image\":{\"@id\":\"https:\\\/\\\/informante.web.na\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/informantenam\",\"https:\\\/\\\/x.com\\\/informantenews\",\"https:\\\/\\\/www.instagram.com\\\/informante_news\",\"https:\\\/\\\/www.youtube.com\\\/channel\\\/UC-cBl9A2bCMZZphxM2pyMkw\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/informante.web.na\\\/#\\\/schema\\\/person\\\/6ab65e7153fe62b690517153b8913a80\",\"name\":\"Staff Reporter\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-ZA\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6a3f99fe38bd6004877c284045a2c7874eaab29eb08429df5cabc23908fc45aa?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6a3f99fe38bd6004877c284045a2c7874eaab29eb08429df5cabc23908fc45aa?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6a3f99fe38bd6004877c284045a2c7874eaab29eb08429df5cabc23908fc45aa?s=96&d=mm&r=g\",\"caption\":\"Staff Reporter\"},\"url\":\"https:\\\/\\\/informante.web.na\\\/?author=10\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Water availability identified as key constraint for \/\/Kharas green hydrogen development - Informant\u00e9","description":"WATER availability in the \/\/Kharas Region has been highlighted as the primary technical constraint for green hydrogen development...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/informante.web.na\/?p=398784","og_locale":"en_US","og_type":"article","og_title":"Water availability identified as key constraint for \/\/Kharas green hydrogen development - Informant\u00e9","og_description":"WATER availability in the \/\/Kharas Region has been highlighted as the primary technical constraint for green hydrogen development...","og_url":"https:\/\/informante.web.na\/?p=398784","og_site_name":"Informant\u00e9","article_publisher":"https:\/\/www.facebook.com\/informantenam","article_published_time":"2026-08-07T06:00:00+00:00","og_image":[{"width":1173,"height":775,"url":"https:\/\/informante.web.na\/wp-content\/uploads\/2026\/08\/The-water-challenge-behind-hydrogen-Informante-Image-workspace.jpg","type":"image\/jpeg"}],"author":"Staff Reporter","twitter_card":"summary_large_image","twitter_creator":"@informantenews","twitter_site":"@informantenews","twitter_misc":{"Written by":"Staff Reporter","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/informante.web.na\/?p=398784#article","isPartOf":{"@id":"https:\/\/informante.web.na\/?p=398784"},"author":{"name":"Staff Reporter","@id":"https:\/\/informante.web.na\/#\/schema\/person\/6ab65e7153fe62b690517153b8913a80"},"headline":"Water availability identified as key constraint for \/\/Kharas green hydrogen development","datePublished":"2026-08-07T06:00:00+00:00","mainEntityOfPage":{"@id":"https:\/\/informante.web.na\/?p=398784"},"wordCount":473,"publisher":{"@id":"https:\/\/informante.web.na\/#organization"},"image":{"@id":"https:\/\/informante.web.na\/?p=398784#primaryimage"},"thumbnailUrl":"https:\/\/informante.web.na\/wp-content\/uploads\/2026\/08\/The-water-challenge-behind-hydrogen-Informante-Image-workspace.jpg","articleSection":["Business","News"],"inLanguage":"en-ZA"},{"@type":"WebPage","@id":"https:\/\/informante.web.na\/?p=398784","url":"https:\/\/informante.web.na\/?p=398784","name":"Water availability identified as key constraint for \/\/Kharas green hydrogen development - Informant\u00e9","isPartOf":{"@id":"https:\/\/informante.web.na\/#website"},"primaryImageOfPage":{"@id":"https:\/\/informante.web.na\/?p=398784#primaryimage"},"image":{"@id":"https:\/\/informante.web.na\/?p=398784#primaryimage"},"thumbnailUrl":"https:\/\/informante.web.na\/wp-content\/uploads\/2026\/08\/The-water-challenge-behind-hydrogen-Informante-Image-workspace.jpg","datePublished":"2026-08-07T06:00:00+00:00","description":"WATER availability in the \/\/Kharas Region has been highlighted as the primary technical constraint for green hydrogen development...","breadcrumb":{"@id":"https:\/\/informante.web.na\/?p=398784#breadcrumb"},"inLanguage":"en-ZA","potentialAction":[{"@type":"ReadAction","target":["https:\/\/informante.web.na\/?p=398784"]}]},{"@type":"ImageObject","inLanguage":"en-ZA","@id":"https:\/\/informante.web.na\/?p=398784#primaryimage","url":"https:\/\/informante.web.na\/wp-content\/uploads\/2026\/08\/The-water-challenge-behind-hydrogen-Informante-Image-workspace.jpg","contentUrl":"https:\/\/informante.web.na\/wp-content\/uploads\/2026\/08\/The-water-challenge-behind-hydrogen-Informante-Image-workspace.jpg","width":1173,"height":775},{"@type":"BreadcrumbList","@id":"https:\/\/informante.web.na\/?p=398784#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/informante.web.na\/"},{"@type":"ListItem","position":2,"name":"Water availability identified as key constraint for \/\/Kharas green hydrogen development"}]},{"@type":"WebSite","@id":"https:\/\/informante.web.na\/#website","url":"https:\/\/informante.web.na\/","name":"Informant\u00e9","description":"","publisher":{"@id":"https:\/\/informante.web.na\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/informante.web.na\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-ZA"},{"@type":"Organization","@id":"https:\/\/informante.web.na\/#organization","name":"Informante","url":"https:\/\/informante.web.na\/","logo":{"@type":"ImageObject","inLanguage":"en-ZA","@id":"https:\/\/informante.web.na\/#\/schema\/logo\/image\/","url":"https:\/\/informante.web.na\/wp-content\/uploads\/2019\/10\/Informante-Logo-box-1.png","contentUrl":"https:\/\/informante.web.na\/wp-content\/uploads\/2019\/10\/Informante-Logo-box-1.png","width":655,"height":656,"caption":"Informante"},"image":{"@id":"https:\/\/informante.web.na\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/informantenam","https:\/\/x.com\/informantenews","https:\/\/www.instagram.com\/informante_news","https:\/\/www.youtube.com\/channel\/UC-cBl9A2bCMZZphxM2pyMkw"]},{"@type":"Person","@id":"https:\/\/informante.web.na\/#\/schema\/person\/6ab65e7153fe62b690517153b8913a80","name":"Staff Reporter","image":{"@type":"ImageObject","inLanguage":"en-ZA","@id":"https:\/\/secure.gravatar.com\/avatar\/6a3f99fe38bd6004877c284045a2c7874eaab29eb08429df5cabc23908fc45aa?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/6a3f99fe38bd6004877c284045a2c7874eaab29eb08429df5cabc23908fc45aa?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/6a3f99fe38bd6004877c284045a2c7874eaab29eb08429df5cabc23908fc45aa?s=96&d=mm&r=g","caption":"Staff Reporter"},"url":"https:\/\/informante.web.na\/?author=10"}]}},"_links":{"self":[{"href":"https:\/\/informante.web.na\/index.php?rest_route=\/wp\/v2\/posts\/398784","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/informante.web.na\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/informante.web.na\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/informante.web.na\/index.php?rest_route=\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/informante.web.na\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=398784"}],"version-history":[{"count":1,"href":"https:\/\/informante.web.na\/index.php?rest_route=\/wp\/v2\/posts\/398784\/revisions"}],"predecessor-version":[{"id":398786,"href":"https:\/\/informante.web.na\/index.php?rest_route=\/wp\/v2\/posts\/398784\/revisions\/398786"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/informante.web.na\/index.php?rest_route=\/wp\/v2\/media\/398785"}],"wp:attachment":[{"href":"https:\/\/informante.web.na\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=398784"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/informante.web.na\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=398784"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/informante.web.na\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=398784"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}